Bennett RD - Pct 3 over Trib of Brazos River
FairParker County, Texas · 1.0 MI W of FM 113 · Structure no. 021840AA0506001
- Built
- 1945
- 80 years old, rebuilt 1998
- Condition
- Fair
- inspected December 2023
- Type
- Slab
- Concrete
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 406
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Bennett RD - Pct 3 over Trib of Brazos River is a concrete slab carrying Bennett RD - Pct 3 over Trib of Brazos River in Parker County, Texas. It was built in 1945 and reconstructed in 1998, so it is 80 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 406 vehicles a day, projected to reach 670 by 2029. The structure is 24 ft (7.3 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bennett RD - Pct 3 over Trib of Brazos River built?
It was built in 1945, making it 80 years old in 2025. It was reconstructed in 1998.
What condition is Bennett RD - Pct 3 over Trib of Brazos River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Bennett RD - Pct 3 over Trib of Brazos River carry?
About 406 vehicles per day (2024 count).
How long is Bennett RD - Pct 3 over Trib of Brazos River?
The structure is 24 ft (7.3 m) long with a longest span of 11 ft (3.4 m) and a deck 26 ft wide.
Who owns Bennett RD - Pct 3 over Trib of Brazos River?
It is owned by the County Highway Agency.