Dennis RD Pct 3 over Patrick Creek
FairPosted for loadParker County, Texas · 0.25 MI NE of FM 1189 · Structure no. 021840AA0457001
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 100 ft
- 1 main span
- Daily traffic
- 3,849
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Dennis RD Pct 3 over Patrick Creek is a steel continuous stringer/multi-beam or girder carrying Dennis RD Pct 3 over Patrick Creek in Parker County, Texas. It was built in 1983, so it is 42 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 3,849 vehicles a day, projected to reach 1,860 by 2029. The structure is 100 ft (30.5 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dennis RD Pct 3 over Patrick Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is Dennis RD Pct 3 over Patrick Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Dennis RD Pct 3 over Patrick Creek carry?
About 3,849 vehicles per day (2024 count).
How long is Dennis RD Pct 3 over Patrick Creek?
The structure is 100 ft (30.5 m) long with a longest span of 59 ft (18 m) and a deck 24 ft wide.
Who owns Dennis RD Pct 3 over Patrick Creek?
It is owned by the County Highway Agency.