US Bridges

Go Forth RD Pct 4 over South Bear Creek

Fair

Parker County, Texas · 1.6 Mi. South of SH 377 · Structure no. 021840AA0409001

Built
1991
34 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
131 ft
3 main spans
Daily traffic
168
2024 count
Owner
County
County Highway Agency

About this bridge

Go Forth RD Pct 4 over South Bear Creek is a steel continuous stringer/multi-beam or girder carrying Go Forth RD Pct 4 over South Bear Creek in Parker County, Texas. It was built in 1991, so it is 34 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 168 vehicles a day, projected to reach 110 by 2030. The structure is 131 ft (39.9 m) long and 16 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesGo Forth RD Pct 4
CrossesSouth Bear Creek
Location1.6 Mi. South of SH 377
RouteCounty Highway 0
StateTexas
Coordinates32.5816, -97.56705
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating56 US tons
Inventory rating34 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length131 ft (39.9 m)
Longest span50 ft (15.2 m)
Deck width16 ft (4.8 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic168 (2024)
Projected traffic110 by 2030
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Go Forth RD Pct 4 over South Bear Creek built?

It was built in 1991, making it 34 years old in 2025.

What condition is Go Forth RD Pct 4 over South Bear Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Go Forth RD Pct 4 over South Bear Creek carry?

About 168 vehicles per day (2024 count).

How long is Go Forth RD Pct 4 over South Bear Creek?

The structure is 131 ft (39.9 m) long with a longest span of 50 ft (15.2 m) and a deck 16 ft wide.

Who owns Go Forth RD Pct 4 over South Bear Creek?

It is owned by the County Highway Agency.