Go Forth RD Pct 4 over South Bear Creek
FairParker County, Texas · 1.6 Mi. South of SH 377 · Structure no. 021840AA0409001
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 131 ft
- 3 main spans
- Daily traffic
- 168
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Go Forth RD Pct 4 over South Bear Creek is a steel continuous stringer/multi-beam or girder carrying Go Forth RD Pct 4 over South Bear Creek in Parker County, Texas. It was built in 1991, so it is 34 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 168 vehicles a day, projected to reach 110 by 2030. The structure is 131 ft (39.9 m) long and 16 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Go Forth RD Pct 4 over South Bear Creek built?
It was built in 1991, making it 34 years old in 2025.
What condition is Go Forth RD Pct 4 over South Bear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Go Forth RD Pct 4 over South Bear Creek carry?
About 168 vehicles per day (2024 count).
How long is Go Forth RD Pct 4 over South Bear Creek?
The structure is 131 ft (39.9 m) long with a longest span of 50 ft (15.2 m) and a deck 16 ft wide.
Who owns Go Forth RD Pct 4 over South Bear Creek?
It is owned by the County Highway Agency.