Underwood RD Pct 4 over Clear Fork Trinity River
GoodParker County, Texas · 2.0 MI West of FM 1187 · Structure no. 021840AA0386001
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 160 ft
- 3 main spans
- Daily traffic
- 230
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Underwood RD Pct 4 over Clear Fork Trinity River is a prestressed concrete stringer/multi-beam or girder carrying Underwood RD Pct 4 over Clear Fork Trinity River in Parker County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 230 vehicles a day, projected to reach 280 by 2030. The structure is 160 ft (48.8 m) long and 26 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Underwood RD Pct 4 over Clear Fork Trinity River built?
It was built in 1999, making it 26 years old in 2025.
What condition is Underwood RD Pct 4 over Clear Fork Trinity River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Underwood RD Pct 4 over Clear Fork Trinity River carry?
About 230 vehicles per day (2010 count).
How long is Underwood RD Pct 4 over Clear Fork Trinity River?
The structure is 160 ft (48.8 m) long with a longest span of 80 ft (24.4 m) and a deck 26 ft wide.
Who owns Underwood RD Pct 4 over Clear Fork Trinity River?
It is owned by the County Highway Agency.