US Bridges

Greenwood RD Pct 3 over Br of Sanchez Creek

Good

Parker County, Texas · 1.77 MI W of US 180 · Structure no. 021840AA0318001

Built
2005
20 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
1,883
2024 count
Owner
County
County Highway Agency

About this bridge

Greenwood RD Pct 3 over Br of Sanchez Creek is a prestressed concrete stringer/multi-beam or girder carrying Greenwood RD Pct 3 over Br of Sanchez Creek in Parker County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,883 vehicles a day, projected to reach 1,080 by 2029. The structure is 55 ft (16.8 m) long and 30 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesGreenwood RD Pct 3
CrossesBr of Sanchez Creek
Location1.77 MI W of US 180
RouteCounty Highway 0
StateTexas
Coordinates32.75264, -97.84588
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length55 ft (16.8 m)
Longest span55 ft (16.8 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,883 (2024)
Projected traffic1,080 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$4,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Greenwood RD Pct 3 over Br of Sanchez Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is Greenwood RD Pct 3 over Br of Sanchez Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Greenwood RD Pct 3 over Br of Sanchez Creek carry?

About 1,883 vehicles per day (2024 count).

How long is Greenwood RD Pct 3 over Br of Sanchez Creek?

The structure is 55 ft (16.8 m) long with a longest span of 55 ft (16.8 m) and a deck 30 ft wide.

Who owns Greenwood RD Pct 3 over Br of Sanchez Creek?

It is owned by the County Highway Agency.