Sarra Lane - Pct 2 over Clear Fk Trinity Ri
FairParker County, Texas · 1.9 Mi. E. of FM 2421 · Structure no. 021840AA0196001
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 53 ft
- 1 main span
- Daily traffic
- 180
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Sarra Lane - Pct 2 over Clear Fk Trinity Ri is a steel stringer/multi-beam or girder carrying Sarra Lane - Pct 2 over Clear Fk Trinity Ri in Parker County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 180 vehicles a day, roughly 3% of them trucks, projected to reach 1,650 by 2042. The structure is 53 ft (16.2 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sarra Lane - Pct 2 over Clear Fk Trinity Ri built?
It was built in 2000, making it 25 years old in 2025.
What condition is Sarra Lane - Pct 2 over Clear Fk Trinity Ri in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Sarra Lane - Pct 2 over Clear Fk Trinity Ri carry?
About 180 vehicles per day (2014 count), of which roughly 3% are trucks.
How long is Sarra Lane - Pct 2 over Clear Fk Trinity Ri?
The structure is 53 ft (16.2 m) long with a longest span of 52 ft (15.9 m) and a deck 28 ft wide.
Who owns Sarra Lane - Pct 2 over Clear Fk Trinity Ri?
It is owned by the County Highway Agency.