US Bridges

Erwin RD Pct 2 over Trib Clear Fork Trinity

Fair

Parker County, Texas · .1 Mi. E. of FM 920 · Structure no. 021840AA0159002

Built
2011
14 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
22 ft
1 main span
Daily traffic
678
2024 count
Owner
County
County Highway Agency

About this bridge

Erwin RD Pct 2 over Trib Clear Fork Trinity is a steel stringer/multi-beam or girder carrying Erwin RD Pct 2 over Trib Clear Fork Trinity in Parker County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 678 vehicles a day, projected to reach 100 by 2030. The structure is 22 ft (6.7 m) long and 24 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesErwin RD Pct 2
CrossesTrib Clear Fork Trinity
Location.1 Mi. E. of FM 920
RouteCounty Highway 0
StateTexas
Coordinates32.97479, -97.85647
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.1 US tons
Inventory rating27.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span22 ft (6.7 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic678 (2024)
Projected traffic100 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Erwin RD Pct 2 over Trib Clear Fork Trinity built?

It was built in 2011, making it 14 years old in 2025.

What condition is Erwin RD Pct 2 over Trib Clear Fork Trinity in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Erwin RD Pct 2 over Trib Clear Fork Trinity carry?

About 678 vehicles per day (2024 count).

How long is Erwin RD Pct 2 over Trib Clear Fork Trinity?

The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 24 ft wide.

Who owns Erwin RD Pct 2 over Trib Clear Fork Trinity?

It is owned by the County Highway Agency.