Ballard RD - Pct 2 over E Fork of Moreland Creek
FairParker County, Texas · 1.7 MI S of FM 2891 · Structure no. 021840AA0148001
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 27 ft
- 1 main span
- Daily traffic
- 110
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Ballard RD - Pct 2 over E Fork of Moreland Creek is a steel stringer/multi-beam or girder carrying Ballard RD - Pct 2 over E Fork of Moreland Creek in Parker County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 110 vehicles a day, projected to reach 100 by 2030. The structure is 27 ft (8.2 m) long and 22 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ballard RD - Pct 2 over E Fork of Moreland Creek built?
It was built in 1981, making it 44 years old in 2025.
What condition is Ballard RD - Pct 2 over E Fork of Moreland Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Ballard RD - Pct 2 over E Fork of Moreland Creek carry?
About 110 vehicles per day (2024 count).
How long is Ballard RD - Pct 2 over E Fork of Moreland Creek?
The structure is 27 ft (8.2 m) long with a longest span of 27 ft (8.2 m) and a deck 22 ft wide.
Who owns Ballard RD - Pct 2 over E Fork of Moreland Creek?
It is owned by the County Highway Agency.