Good

Parker County, Texas · 2.13 Mi. NE of FM 2552 · Structure no. 021840031407233

Built
2017
8 years old
Condition
Good
inspected September 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
220 ft
2 main spans
Daily traffic
48,880
2017 count
Owner
State
State Highway Agency

About this bridge

Center Point Rd. over IH 20 is a prestressed concrete stringer/multi-beam or girder carrying Center Point Rd. over IH 20 in Parker County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 48,880 vehicles a day, roughly 19% of them trucks, projected to reach 68,430 by 2037. The structure is 220 ft (67.1 m) long and 96 ft wide.

CarriesCenter Point Rd.
CrossesIH 20
Location2.13 Mi. NE of FM 2552
RouteCity Street 0
StateTexas
Coordinates32.74804, -97.7287
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length220 ft (67.1 m)
Longest span110 ft (33.5 m)
Deck width96 ft (29.3 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic48,880 (2017)
Projected traffic68,430 by 2037
Trucks19%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Center Point Rd. over IH 20 built?

It was built in 2017, making it 8 years old in 2025.

What condition is Center Point Rd. over IH 20 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.

How much traffic does Center Point Rd. over IH 20 carry?

About 48,880 vehicles per day (2017 count), of which roughly 19% are trucks.

How long is Center Point Rd. over IH 20?

The structure is 220 ft (67.1 m) long with a longest span of 110 ft (33.5 m) and a deck 96 ft wide.

Who owns Center Point Rd. over IH 20?

It is owned by the State Highway Agency.