Howard ST - Pct 2 over Trib of Pecan Branch
FairPosted for loadPalo Pinto County, Texas · 1.8 Mi. N. of FM 4 · Structure no. 021820B00065001
- Built
- 2013
- 12 years old
- Condition
- Fair
- inspected February 2023
- Type
- Culvert
- Steel
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 50
- 2012 count
- Owner
- County
- County Highway Agency
About this bridge
Howard ST - Pct 2 over Trib of Pecan Branch is a steel culvert carrying Howard ST - Pct 2 over Trib of Pecan Branch in Palo Pinto County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 50 vehicles a day, roughly 1% of them trucks, projected to reach 100 by 2032. The structure is 22 ft (6.7 m) long and 23 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Howard ST - Pct 2 over Trib of Pecan Branch built?
It was built in 2013, making it 12 years old in 2025.
What condition is Howard ST - Pct 2 over Trib of Pecan Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Howard ST - Pct 2 over Trib of Pecan Branch carry?
About 50 vehicles per day (2012 count), of which roughly 1% are trucks.
How long is Howard ST - Pct 2 over Trib of Pecan Branch?
The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 23 ft wide.
Who owns Howard ST - Pct 2 over Trib of Pecan Branch?
It is owned by the County Highway Agency.