Davidson Cem Pct 3 over S Fork Palo Pinto Creek
GoodPalo Pinto County, Texas · 2.7 MI E of SH 16 · Structure no. 021820AA0229001
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 145 ft
- 1 main span
- Daily traffic
- 330
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Davidson Cem Pct 3 over S Fork Palo Pinto Creek is a prestressed concrete stringer/multi-beam or girder carrying Davidson Cem Pct 3 over S Fork Palo Pinto Creek in Palo Pinto County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 330 vehicles a day, projected to reach 380 by 2036. The structure is 145 ft (44.2 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Davidson Cem Pct 3 over S Fork Palo Pinto Creek built?
It was built in 2002, making it 23 years old in 2025.
What condition is Davidson Cem Pct 3 over S Fork Palo Pinto Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Davidson Cem Pct 3 over S Fork Palo Pinto Creek carry?
About 330 vehicles per day (2016 count).
How long is Davidson Cem Pct 3 over S Fork Palo Pinto Creek?
The structure is 145 ft (44.2 m) long with a longest span of 65 ft (19.8 m) and a deck 30 ft wide.
Who owns Davidson Cem Pct 3 over S Fork Palo Pinto Creek?
It is owned by the County Highway Agency.