Panama RD - Pct 4 over Saline Creek
GoodPalo Pinto County, Texas · 1.0 MI E of IH-20 · Structure no. 021820AA0204001
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 60 ft
- 1 main span
- Daily traffic
- 26
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Panama RD - Pct 4 over Saline Creek is a steel stringer/multi-beam or girder carrying Panama RD - Pct 4 over Saline Creek in Palo Pinto County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 26 vehicles a day, projected to reach 100 by 2036. The structure is 60 ft (18.3 m) long and 26 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Panama RD - Pct 4 over Saline Creek built?
It was built in 2006, making it 19 years old in 2025.
What condition is Panama RD - Pct 4 over Saline Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Panama RD - Pct 4 over Saline Creek carry?
About 26 vehicles per day (2022 count).
How long is Panama RD - Pct 4 over Saline Creek?
The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 26 ft wide.
Who owns Panama RD - Pct 4 over Saline Creek?
It is owned by the County Highway Agency.