US Bridges

FM 2256 over Trib to Whatley Creek

Good

Palo Pinto County, Texas · 3.1 Mi. SW of US 281 · Structure no. 021820273501008

Built
2010
15 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
26 ft
3 main spans
Daily traffic
1,025
2024 count
Owner
State
State Highway Agency

About this bridge

FM 2256 over Trib to Whatley Creek is a concrete culvert carrying FM 2256 over Trib to Whatley Creek in Palo Pinto County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,025 vehicles a day, roughly 14% of them trucks, projected to reach 1,900 by 2030. The structure is 26 ft (7.9 m) long and 63 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesFM 2256
CrossesTrib to Whatley Creek
Location3.1 Mi. SW of US 281
RouteState Highway 2256
StateTexas
Coordinates32.74634, -98.12461
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span7 ft (2.1 m)
Deck width63 ft (19.2 m)
Roadway width61 ft (18.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,025 (2024)
Projected traffic1,900 by 2030
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2256 over Trib to Whatley Creek built?

It was built in 2010, making it 15 years old in 2025.

What condition is FM 2256 over Trib to Whatley Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does FM 2256 over Trib to Whatley Creek carry?

About 1,025 vehicles per day (2024 count), of which roughly 14% are trucks.

How long is FM 2256 over Trib to Whatley Creek?

The structure is 26 ft (7.9 m) long with a longest span of 7 ft (2.1 m) and a deck 63 ft wide.

Who owns FM 2256 over Trib to Whatley Creek?

It is owned by the State Highway Agency.