US Bridges

FM 919 over Panther Creek Relief

Good

Palo Pinto County, Texas · 2.1 Mi. N. of SH 193 · Structure no. 021820117801017

Built
2014
11 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
48 ft
4 main spans
Daily traffic
623
2024 count
Owner
State
State Highway Agency

About this bridge

FM 919 over Panther Creek Relief is a concrete culvert carrying FM 919 over Panther Creek Relief in Palo Pinto County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 623 vehicles a day, projected to reach 1,010 by 2034. The structure is 48 ft (14.6 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFM 919
CrossesPanther Creek Relief
Location2.1 Mi. N. of SH 193
RouteState Highway 919
StateTexas
Coordinates32.57943, -98.37026
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length48 ft (14.6 m)
Longest span10 ft (3 m)
Deck width40 ft (12.2 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic623 (2024)
Projected traffic1,010 by 2034
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 919 over Panther Creek Relief built?

It was built in 2014, making it 11 years old in 2025.

What condition is FM 919 over Panther Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does FM 919 over Panther Creek Relief carry?

About 623 vehicles per day (2024 count).

How long is FM 919 over Panther Creek Relief?

The structure is 48 ft (14.6 m) long with a longest span of 10 ft (3 m) and a deck 40 ft wide.

Who owns FM 919 over Panther Creek Relief?

It is owned by the State Highway Agency.