US Bridges

Old HWY 90 over Bairds Bayou Relief

Fair

Orange County, Texas · 3.2 MI SW of FM 105 · Structure no. 201810G00436006

Built
2016
9 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
549
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

Old HWY 90 over Bairds Bayou Relief is a prestressed concrete stringer/multi-beam or girder carrying Old HWY 90 over Bairds Bayou Relief in Orange County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 549 vehicles a day, roughly 3% of them trucks, projected to reach 770 by 2037. The structure is 60 ft (18.3 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesOld HWY 90
CrossesBairds Bayou Relief
Location3.2 MI SW of FM 105
RouteCity Street 0
StateTexas
Coordinates30.09974, -94.05856
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span58 ft (17.7 m)
Deck width26 ft (8 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic549 (2016)
Projected traffic770 by 2037
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Old HWY 90 over Bairds Bayou Relief built?

It was built in 2016, making it 9 years old in 2025.

What condition is Old HWY 90 over Bairds Bayou Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Old HWY 90 over Bairds Bayou Relief carry?

About 549 vehicles per day (2016 count), of which roughly 3% are trucks.

How long is Old HWY 90 over Bairds Bayou Relief?

The structure is 60 ft (18.3 m) long with a longest span of 58 ft (17.7 m) and a deck 26 ft wide.

Who owns Old HWY 90 over Bairds Bayou Relief?

It is owned by the City or Municipal Highway Agency.