US Bridges

E Railroad ST over Schoolhouse Ditch

Good

Orange County, Texas · 0.2 Mi. E. of SH 105 · Structure no. 201810C02055003

Built
2018
7 years old
Condition
Good
inspected June 2023
Type
Frame
Concrete
Length
22 ft
1 main span
Daily traffic
720
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

E Railroad ST over Schoolhouse Ditch is a concrete frame carrying E Railroad ST over Schoolhouse Ditch in Orange County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 720 vehicles a day, roughly 3% of them trucks, projected to reach 1,008 by 2041. The structure is 22 ft (6.7 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE Railroad ST
CrossesSchoolhouse Ditch
Location0.2 Mi. E. of SH 105
RouteCity Street 0
StateTexas
Coordinates30.12658, -94.0098
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span22 ft (6.7 m)
Deck width50 ft (15.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic720 (2016)
Projected traffic1,008 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E Railroad ST over Schoolhouse Ditch built?

It was built in 2018, making it 7 years old in 2025.

What condition is E Railroad ST over Schoolhouse Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does E Railroad ST over Schoolhouse Ditch carry?

About 720 vehicles per day (2016 count), of which roughly 3% are trucks.

How long is E Railroad ST over Schoolhouse Ditch?

The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 50 ft wide.

Who owns E Railroad ST over Schoolhouse Ditch?

It is owned by the City or Municipal Highway Agency.