US Bridges

Midway Rd(se 2370) over Draw

FairPosted for load

Navarro County, Texas · 2.1 MI NE of FM 416 · Structure no. 181750AA2370001

Built
1985
40 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
35 ft
1 main span
Daily traffic
200
2021 count
Owner
County
County Highway Agency

About this bridge

Midway Rd(se 2370) over Draw is a prestressed concrete stringer/multi-beam or girder carrying Midway Rd(se 2370) over Draw in Navarro County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 200 vehicles a day, projected to reach 300 by 2042. The structure is 35 ft (10.7 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesMidway Rd(se 2370)
CrossesDraw
Location2.1 MI NE of FM 416
RouteCounty Highway 2370
StateTexas
Coordinates31.94996, -96.23692
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length35 ft (10.7 m)
Longest span34 ft (10.4 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2021)
Projected traffic300 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Midway Rd(se 2370) over Draw built?

It was built in 1985, making it 40 years old in 2025.

What condition is Midway Rd(se 2370) over Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Midway Rd(se 2370) over Draw carry?

About 200 vehicles per day (2021 count).

How long is Midway Rd(se 2370) over Draw?

The structure is 35 ft (10.7 m) long with a longest span of 34 ft (10.4 m) and a deck 26 ft wide.

Who owns Midway Rd(se 2370) over Draw?

It is owned by the County Highway Agency.