CR SW 0030 over Richland Creek Relief
GoodNavarro County, Texas · 1.40 MI SE of FM 709 · Structure no. 181750AA0501004
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 65 ft
- 1 main span
- Daily traffic
- 536
- 2011 count
- Owner
- County
- County Highway Agency
About this bridge
CR SW 0030 over Richland Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying CR SW 0030 over Richland Creek Relief in Navarro County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 536 vehicles a day, roughly 20% of them trucks, projected to reach 536 by 2031. The structure is 65 ft (19.8 m) long and 26 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR SW 0030 over Richland Creek Relief built?
It was built in 2009, making it 16 years old in 2025.
What condition is CR SW 0030 over Richland Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does CR SW 0030 over Richland Creek Relief carry?
About 536 vehicles per day (2011 count), of which roughly 20% are trucks.
How long is CR SW 0030 over Richland Creek Relief?
The structure is 65 ft (19.8 m) long with a longest span of 64 ft (19.5 m) and a deck 26 ft wide.
Who owns CR SW 0030 over Richland Creek Relief?
It is owned by the County Highway Agency.