US Bridges

SH 31 WB over Post Oak Creek

FairClosed to traffic

Navarro County, Texas · 1.90 MI E of IH45 · Structure no. 181750016301002

Built
1933
92 years old
Condition
Fair
inspected January 2024
Type
Tee Beam
Concrete
Length
186 ft
7 main spans
Daily traffic
7,826
2020 count
Owner
State
State Highway Agency

About this bridge

SH 31 WB over Post Oak Creek is a concrete tee beam carrying SH 31 WB over Post Oak Creek in Navarro County, Texas. It was built in 1933, so it is 92 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.

It carries about 7,826 vehicles a day, roughly 11% of them trucks, projected to reach 10,120 by 2033. The structure is 186 ft (56.7 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 31 WB
CrossesPost Oak Creek
Location1.90 MI E of IH45
RouteState Highway 31
StateTexas
Coordinates32.10184, -96.40952
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2024
Inspection intervalevery 12 months
Operating statusClosed to all traffic
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation0: Immediate repair necessary to put back in service
Deck geometry0: Immediate repair necessary to put back in service
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating0 US tons
Inventory rating0 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans7
Design loadH 15
Structure length186 ft (56.7 m)
Longest span26 ft (7.9 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,826 (2020)
Projected traffic10,120 by 2033
Trucks11%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$11,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 31 WB over Post Oak Creek built?

It was built in 1933, making it 92 years old in 2025.

What condition is SH 31 WB over Post Oak Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does SH 31 WB over Post Oak Creek carry?

About 7,826 vehicles per day (2020 count), of which roughly 11% are trucks.

How long is SH 31 WB over Post Oak Creek?

The structure is 186 ft (56.7 m) long with a longest span of 26 ft (7.9 m) and a deck 27 ft wide.

Who owns SH 31 WB over Post Oak Creek?

It is owned by the State Highway Agency.