IH 45 SB Ml over Richland Creek Relief
GoodNavarro County, Texas · 0.60 MI N of SH 14 · Structure no. 181750009301087
- Built
- 2005
- 20 years old, rebuilt 2018
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,040 ft
- 13 main spans
- Daily traffic
- 20,129
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 45 SB Ml over Richland Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying IH 45 SB Ml over Richland Creek Relief in Navarro County, Texas. It was built in 2005 and reconstructed in 2018, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,129 vehicles a day, roughly 34% of them trucks, projected to reach 23,960 by 2042. The structure is 1,040 ft (317 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 45 SB Ml over Richland Creek Relief built?
It was built in 2005, making it 20 years old in 2025. It was reconstructed in 2018.
What condition is IH 45 SB Ml over Richland Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does IH 45 SB Ml over Richland Creek Relief carry?
About 20,129 vehicles per day (2023 count), of which roughly 34% are trucks.
How long is IH 45 SB Ml over Richland Creek Relief?
The structure is 1,040 ft (317 m) long with a longest span of 80 ft (24.4 m) and a deck 54 ft wide.
Who owns IH 45 SB Ml over Richland Creek Relief?
It is owned by the State Highway Agency.