Bus 45 NB over Briar Creek
GoodNavarro County, Texas · 0.25 MI S of IH 45 · Structure no. 181750009213416
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 280 ft
- 4 main spans
- Daily traffic
- 8,170
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Bus 45 NB over Briar Creek is a prestressed concrete stringer/multi-beam or girder carrying Bus 45 NB over Briar Creek in Navarro County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,170 vehicles a day, roughly 9% of them trucks, projected to reach 15,200 by 2035. The structure is 280 ft (85.3 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bus 45 NB over Briar Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is Bus 45 NB over Briar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Bus 45 NB over Briar Creek carry?
About 8,170 vehicles per day (2015 count), of which roughly 9% are trucks.
How long is Bus 45 NB over Briar Creek?
The structure is 280 ft (85.3 m) long with a longest span of 70 ft (21.3 m) and a deck 40 ft wide.
Who owns Bus 45 NB over Briar Creek?
It is owned by the State Highway Agency.