CR210(POST Oak Rd) over Toliver Branch
FairNacogdoches County, Texas · 0.9 MI E of Lp 495 · Structure no. 111740AA1200001
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 74 ft
- 2 main spans
- Daily traffic
- 260
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CR210(POST Oak Rd) over Toliver Branch is a steel continuous stringer/multi-beam or girder carrying CR210(POST Oak Rd) over Toliver Branch in Nacogdoches County, Texas. It was built in 1992, so it is 33 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 260 vehicles a day, projected to reach 145 by 2031. The structure is 74 ft (22.6 m) long and 16 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR210(POST Oak Rd) over Toliver Branch built?
It was built in 1992, making it 33 years old in 2025.
What condition is CR210(POST Oak Rd) over Toliver Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does CR210(POST Oak Rd) over Toliver Branch carry?
About 260 vehicles per day (2023 count).
How long is CR210(POST Oak Rd) over Toliver Branch?
The structure is 74 ft (22.6 m) long with a longest span of 25 ft (7.6 m) and a deck 16 ft wide.
Who owns CR210(POST Oak Rd) over Toliver Branch?
It is owned by the County Highway Agency.