Greenway DR over Live Oak Creek
FairMontgomery County, Texas · 0.17 MI S of W Davis ST · Structure no. 121700C00410001
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected December 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 233
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Greenway DR over Live Oak Creek is a prestressed concrete box beam or girders - multiple carrying Greenway DR over Live Oak Creek in Montgomery County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 233 vehicles a day, roughly 3% of them trucks, projected to reach 233 by 2042. The structure is 60 ft (18.3 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greenway DR over Live Oak Creek built?
It was built in 1975, making it 50 years old in 2025.
What condition is Greenway DR over Live Oak Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Greenway DR over Live Oak Creek carry?
About 233 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is Greenway DR over Live Oak Creek?
The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 36 ft wide.
Who owns Greenway DR over Live Oak Creek?
It is owned by the City or Municipal Highway Agency.