US Bridges

Grand Village EB over Crescent Creek

Good

Montgomery County, Texas · 0.4 MI W of IH 45 · Structure no. 121700C00392047

Built
2017
8 years old
Condition
Good
inspected December 2023
Type
Arch - Deck
Concrete
Length
26 ft
1 main span
Daily traffic
1,500
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Grand Village EB over Crescent Creek is a concrete arch - deck carrying Grand Village EB over Crescent Creek in Montgomery County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 3% of them trucks, projected to reach 2,500 by 2042. The structure is 26 ft (7.9 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGrand Village EB
CrossesCrescent Creek
Location0.4 MI W of IH 45
RouteCity Street 0
StateTexas
Coordinates30.2755, -95.46375
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span26 ft (7.9 m)
Deck width40 ft (12.2 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic2,500 by 2042
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Grand Village EB over Crescent Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is Grand Village EB over Crescent Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Grand Village EB over Crescent Creek carry?

About 1,500 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Grand Village EB over Crescent Creek?

The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m) and a deck 40 ft wide.

Who owns Grand Village EB over Crescent Creek?

It is owned by the City or Municipal Highway Agency.