US Bridges

Peach Creek LN over Peach Creek

Fair

Montgomery County, Texas · 0.08 MI W of Nature Cent · Structure no. 121700B50441010

Built
2015
10 years old
Condition
Fair
inspected November 2023
Type
Truss - Thru
Steel
Length
200 ft
1 main span
Daily traffic
100
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

Peach Creek LN over Peach Creek is a steel truss - thru carrying Peach Creek LN over Peach Creek in Montgomery County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 100 by 2035. The structure is 200 ft (61 m) long and 16 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPeach Creek LN
CrossesPeach Creek
Location0.08 MI W of Nature Cent
RouteState Highway 0
StateTexas
Coordinates30.1375, -95.16947
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeTruss - Thru
MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length200 ft (61 m)
Longest span100 ft (30.5 m)
Deck width16 ft (4.9 m)
Roadway width15 ft (4.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2016)
Projected traffic100 by 2035
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peach Creek LN over Peach Creek built?

It was built in 2015, making it 10 years old in 2025.

What condition is Peach Creek LN over Peach Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Peach Creek LN over Peach Creek carry?

About 100 vehicles per day (2016 count), of which roughly 1% are trucks.

How long is Peach Creek LN over Peach Creek?

The structure is 200 ft (61 m) long with a longest span of 100 ft (30.5 m) and a deck 16 ft wide.

Who owns Peach Creek LN over Peach Creek?

It is owned by the City or Municipal Highway Agency.