Woodlands Pkwy EB over Drainage Ditch
FairMontgomery County, Texas · 5.3 MI W of IH 45 · Structure no. 121700AA0601001
- Built
- 1985
- 40 years old, rebuilt 2009
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 23,181
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Woodlands Pkwy EB over Drainage Ditch is a concrete stringer/multi-beam or girder carrying Woodlands Pkwy EB over Drainage Ditch in Montgomery County, Texas. It was built in 1985 and reconstructed in 2009, so it is 40 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,181 vehicles a day, roughly 3% of them trucks, projected to reach 32,453 by 2042. The structure is 42 ft (12.8 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Woodlands Pkwy EB over Drainage Ditch built?
It was built in 1985, making it 40 years old in 2025. It was reconstructed in 2009.
What condition is Woodlands Pkwy EB over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Woodlands Pkwy EB over Drainage Ditch carry?
About 23,181 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Woodlands Pkwy EB over Drainage Ditch?
The structure is 42 ft (12.8 m) long with a longest span of 40 ft (12.2 m) and a deck 50 ft wide.
Who owns Woodlands Pkwy EB over Drainage Ditch?
It is owned by the County Highway Agency.