US Bridges

SH 249 Culvert 10 over Mill Creek Trib. No 1

Fair

Montgomery County, Texas · 1.09 MI NW of FM 149 · Structure no. 121700363501064

Built
2020
5 years old
Condition
Fair
inspected December 2024
Type
Culvert
Concrete
Length
49 ft
3 main spans
Daily traffic
10,700
2020 count
Owner
State
State Highway Agency

About this bridge

SH 249 Culvert 10 over Mill Creek Trib. No 1 is a concrete culvert carrying SH 249 Culvert 10 over Mill Creek Trib. No 1 in Montgomery County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,700 vehicles a day, roughly 7% of them trucks, projected to reach 15,700 by 2040. The structure is 49 ft (14.9 m) long and 253 ft wide.

CarriesSH 249 Culvert 10
CrossesMill Creek Trib. No 1
Location1.09 MI NW of FM 149
StateTexas
Coordinates30.19539, -95.69448
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length49 ft (14.9 m)
Longest span10 ft (3 m)
Deck width253 ft (77.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,700 (2020)
Projected traffic15,700 by 2040
Trucks7%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 249 Culvert 10 over Mill Creek Trib. No 1 built?

It was built in 2020, making it 5 years old in 2025.

What condition is SH 249 Culvert 10 over Mill Creek Trib. No 1 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does SH 249 Culvert 10 over Mill Creek Trib. No 1 carry?

About 10,700 vehicles per day (2020 count), of which roughly 7% are trucks.

How long is SH 249 Culvert 10 over Mill Creek Trib. No 1?

The structure is 49 ft (14.9 m) long with a longest span of 10 ft (3 m) and a deck 253 ft wide.

Who owns SH 249 Culvert 10 over Mill Creek Trib. No 1?

It is owned by the State Highway Agency.