SH 99 Wbml over Loop 494 & UPRR
GoodMontgomery County, Texas · 0.5 MI E of IH 69 · Structure no. 121700351007289
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected December 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 261 ft
- 2 main spans
- Daily traffic
- 15,700
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
SH 99 Wbml over Loop 494 & UPRR is a prestressed concrete stringer/multi-beam or girder carrying SH 99 Wbml over Loop 494 & UPRR in Montgomery County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,700 vehicles a day, roughly 5% of them trucks, projected to reach 1 by 1900. The structure is 261 ft (79.6 m) long and 40 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 99 Wbml over Loop 494 & UPRR built?
It was built in 2022, making it 3 years old in 2025.
What condition is SH 99 Wbml over Loop 494 & UPRR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.
How much traffic does SH 99 Wbml over Loop 494 & UPRR carry?
About 15,700 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is SH 99 Wbml over Loop 494 & UPRR?
The structure is 261 ft (79.6 m) long with a longest span of 144 ft (43.9 m) and a deck 40 ft wide.
Who owns SH 99 Wbml over Loop 494 & UPRR?
It is owned by the State Highway Agency.