FM 3083 over West Fork Crystal Creek
GoodMontgomery County, Texas · 3.20 MI SE of Lp 336 · Structure no. 121700315801004
- Built
- 1971
- 54 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 160 ft
- 4 main spans
- Daily traffic
- 11,405
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FM 3083 over West Fork Crystal Creek is a concrete stringer/multi-beam or girder carrying FM 3083 over West Fork Crystal Creek in Montgomery County, Texas. It was built in 1971, so it is 54 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,405 vehicles a day, roughly 9% of them trucks, projected to reach 12,640 by 2033. The structure is 160 ft (48.8 m) long and 50 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 3083 over West Fork Crystal Creek built?
It was built in 1971, making it 54 years old in 2025.
What condition is FM 3083 over West Fork Crystal Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does FM 3083 over West Fork Crystal Creek carry?
About 11,405 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is FM 3083 over West Fork Crystal Creek?
The structure is 160 ft (48.8 m) long with a longest span of 40 ft (12.2 m) and a deck 50 ft wide.
Who owns FM 3083 over West Fork Crystal Creek?
It is owned by the State Highway Agency.