IH 45 Sbfr over Spring CR
FairMontgomery County, Texas · At Harris C/L · Structure no. 121700011004118
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 844 ft
- 1 main span
- Daily traffic
- 18,544
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 45 Sbfr over Spring CR is a steel continuous stringer/multi-beam or girder carrying IH 45 Sbfr over Spring CR in Montgomery County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,544 vehicles a day, roughly 6% of them trucks, projected to reach 36,346 by 2042. The structure is 844 ft (257.3 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 45 Sbfr over Spring CR built?
It was built in 1990, making it 35 years old in 2025.
What condition is IH 45 Sbfr over Spring CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does IH 45 Sbfr over Spring CR carry?
About 18,544 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is IH 45 Sbfr over Spring CR?
The structure is 844 ft (257.3 m) long with a longest span of 152 ft (46.3 m) and a deck 45 ft wide.
Who owns IH 45 Sbfr over Spring CR?
It is owned by the State Highway Agency.