CR 452/STAR Mannrd over Clear Creek
GoodMontague County, Texas · 1.1 MI W of FM 677 · Structure no. 031690AA0452001
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 100 ft
- 1 main span
- Daily traffic
- 24
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR 452/STAR Mannrd over Clear Creek is a prestressed concrete stringer/multi-beam or girder carrying CR 452/STAR Mannrd over Clear Creek in Montague County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 24 vehicles a day, projected to reach 300 by 2030. The structure is 100 ft (30.5 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 452/STAR Mannrd over Clear Creek built?
It was built in 2006, making it 19 years old in 2025.
What condition is CR 452/STAR Mannrd over Clear Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does CR 452/STAR Mannrd over Clear Creek carry?
About 24 vehicles per day (2020 count).
How long is CR 452/STAR Mannrd over Clear Creek?
The structure is 100 ft (30.5 m) long with a longest span of 100 ft (30.5 m) and a deck 26 ft wide.
Who owns CR 452/STAR Mannrd over Clear Creek?
It is owned by the County Highway Agency.