US Bridges

CR 395 over Draw

Fair

Montague County, Texas · 1.6 MI E of FM 2382 · Structure no. 031690AA0395001

Built
1990
35 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
30 ft
1 main span
Daily traffic
18
2020 count
Owner
County
County Highway Agency

About this bridge

CR 395 over Draw is a steel stringer/multi-beam or girder carrying CR 395 over Draw in Montague County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 18 vehicles a day, projected to reach 60 by 2030. The structure is 30 ft (9.1 m) long and 16 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCR 395
CrossesDraw
Location1.6 MI E of FM 2382
RouteCounty Highway 395
StateTexas
Coordinates33.69266, -97.48528
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating52 US tons
Inventory rating32 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length30 ft (9.1 m)
Longest span29 ft (8.8 m)
Deck width16 ft (4.9 m)
Roadway width16 ft (4.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18 (2020)
Projected traffic60 by 2030
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 395 over Draw built?

It was built in 1990, making it 35 years old in 2025.

What condition is CR 395 over Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does CR 395 over Draw carry?

About 18 vehicles per day (2020 count).

How long is CR 395 over Draw?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.8 m) and a deck 16 ft wide.

Who owns CR 395 over Draw?

It is owned by the County Highway Agency.