CR 354/FRUITLAND over Middle Creek
FairMontague County, Texas · 0.4 MI SW of US 287 · Structure no. 031690AA0354002
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 26 ft
- 1 main span
- Daily traffic
- 58
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR 354/FRUITLAND over Middle Creek is a steel stringer/multi-beam or girder carrying CR 354/FRUITLAND over Middle Creek in Montague County, Texas. It was built in 1978, so it is 47 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 58 vehicles a day, projected to reach 220 by 2030. The structure is 26 ft (7.9 m) long and 15 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 354/FRUITLAND over Middle Creek built?
It was built in 1978, making it 47 years old in 2025.
What condition is CR 354/FRUITLAND over Middle Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does CR 354/FRUITLAND over Middle Creek carry?
About 58 vehicles per day (2020 count).
How long is CR 354/FRUITLAND over Middle Creek?
The structure is 26 ft (7.9 m) long with a longest span of 25 ft (7.6 m) and a deck 15 ft wide.
Who owns CR 354/FRUITLAND over Middle Creek?
It is owned by the County Highway Agency.