CR 125/RED Riv Sta over Salt Creek
FairMontague County, Texas · 3.6 MI S of Beg CO RD 125 · Structure no. 031690AA0125001
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 75 ft
- 2 main spans
- Daily traffic
- 19
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR 125/RED Riv Sta over Salt Creek is a steel continuous stringer/multi-beam or girder carrying CR 125/RED Riv Sta over Salt Creek in Montague County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19 vehicles a day, projected to reach 50 by 2027. The structure is 75 ft (22.9 m) long and 20 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 125/RED Riv Sta over Salt Creek built?
It was built in 1985, making it 40 years old in 2025.
What condition is CR 125/RED Riv Sta over Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does CR 125/RED Riv Sta over Salt Creek carry?
About 19 vehicles per day (2020 count).
How long is CR 125/RED Riv Sta over Salt Creek?
The structure is 75 ft (22.9 m) long with a longest span of 48 ft (14.6 m) and a deck 20 ft wide.
Who owns CR 125/RED Riv Sta over Salt Creek?
It is owned by the County Highway Agency.