US Bridges

FM 455 over Mallard Creek

Fair

Montague County, Texas · 6.5 MI SE of SH 59 · Structure no. 031690084501003

Built
1949
76 years old
Condition
Fair
inspected March 2024
Type
Culvert
Concrete
Length
39 ft
3 main spans
Daily traffic
650
2020 count
Owner
State
State Highway Agency

About this bridge

FM 455 over Mallard Creek is a concrete culvert carrying FM 455 over Mallard Creek in Montague County, Texas. It was built in 1949, so it is 76 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 650 vehicles a day, roughly 8% of them trucks, projected to reach 1,380 by 2033. The structure is 39 ft (11.9 m) long and 27 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesFM 455
CrossesMallard Creek
Location6.5 MI SE of SH 59
RouteState Highway 455
StateTexas
Coordinates33.58728, -97.65951
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadH 15
Structure length39 ft (11.9 m)
Longest span10 ft (3 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic650 (2020)
Projected traffic1,380 by 2033
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 455 over Mallard Creek built?

It was built in 1949, making it 76 years old in 2025.

What condition is FM 455 over Mallard Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does FM 455 over Mallard Creek carry?

About 650 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is FM 455 over Mallard Creek?

The structure is 39 ft (11.9 m) long with a longest span of 10 ft (3 m) and a deck 27 ft wide.

Who owns FM 455 over Mallard Creek?

It is owned by the State Highway Agency.