US Bridges

CR 446 over Salty Creek

Good

Milam County, Texas · 4.5 MI SE of JCT US 79 · Structure no. 171660AA0446001

Built
2021
4 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
50 ft
1 main span
Daily traffic
51
2017 count
Owner
County
County Highway Agency

About this bridge

CR 446 over Salty Creek is a steel stringer/multi-beam or girder carrying CR 446 over Salty Creek in Milam County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 51 vehicles a day, projected to reach 1 by 1900. The structure is 50 ft (15.2 m) long and 24 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCR 446
CrossesSalty Creek
Location4.5 MI SE of JCT US 79
RouteState Highway 446
StateTexas
Coordinates30.59314, -97.14025
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47 US tons
Inventory rating33 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length50 ft (15.2 m)
Longest span50 ft (15.2 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic51 (2017)
Projected traffic1 by 1900
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 446 over Salty Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is CR 446 over Salty Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does CR 446 over Salty Creek carry?

About 51 vehicles per day (2017 count).

How long is CR 446 over Salty Creek?

The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 24 ft wide.

Who owns CR 446 over Salty Creek?

It is owned by the County Highway Agency.