US Bridges

SH 158 Ebfr over Draw

Good

Midland County, Texas · 0.50 MI W of Lp 250 · Structure no. 061650046302008

Built
1983
42 years old, rebuilt 2022
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
39 ft
7 main spans
Daily traffic
2,889
2023 count
Owner
State
State Highway Agency

About this bridge

SH 158 Ebfr over Draw is a concrete culvert carrying SH 158 Ebfr over Draw in Midland County, Texas. It was built in 1983 and reconstructed in 2022, so it is 42 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,889 vehicles a day, roughly 5% of them trucks, projected to reach 5,950 by 2037. The structure is 39 ft (11.9 m) long and 74 ft wide.

CarriesSH 158 Ebfr
CrossesDraw
Location0.50 MI W of Lp 250
RouteState Highway 158
StateTexas
Coordinates31.99534, -102.16211
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans7
Design loadHS 20
Structure length39 ft (11.9 m)
Longest span5 ft (1.5 m)
Deck width74 ft (22.6 m)
Roadway width45 ft (13.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,889 (2023)
Projected traffic5,950 by 2037
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 158 Ebfr over Draw built?

It was built in 1983, making it 42 years old in 2025. It was reconstructed in 2022.

What condition is SH 158 Ebfr over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does SH 158 Ebfr over Draw carry?

About 2,889 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SH 158 Ebfr over Draw?

The structure is 39 ft (11.9 m) long with a longest span of 5 ft (1.5 m) and a deck 74 ft wide.

Who owns SH 158 Ebfr over Draw?

It is owned by the State Highway Agency.