US Bridges

SH 349 over Draw

Good

Midland County, Texas · 0.75 MI S of IH 20 · Structure no. 061650038009015

Built
1975
50 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
22 ft
4 main spans
Daily traffic
17,810
2020 count
Owner
State
State Highway Agency

About this bridge

SH 349 over Draw is a concrete culvert carrying SH 349 over Draw in Midland County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,810 vehicles a day, roughly 18% of them trucks, projected to reach 23,430 by 2033. The structure is 22 ft (6.7 m) long and 94 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSH 349
CrossesDraw
Location0.75 MI S of IH 20
RouteState Highway 349
StateTexas
Coordinates31.96164, -102.07045
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span5 ft (1.5 m)
Deck width94 ft (28.7 m)
Roadway width83 ft (25.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,810 (2020)
Projected traffic23,430 by 2033
Trucks18%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 349 over Draw built?

It was built in 1975, making it 50 years old in 2025.

What condition is SH 349 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does SH 349 over Draw carry?

About 17,810 vehicles per day (2020 count), of which roughly 18% are trucks.

How long is SH 349 over Draw?

The structure is 22 ft (6.7 m) long with a longest span of 5 ft (1.5 m) and a deck 94 ft wide.

Who owns SH 349 over Draw?

It is owned by the State Highway Agency.