CR 511 over Draw
GoodMedina County, Texas · 2.6 MI E of Uvalde C/L · Structure no. 151630AA0130007
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected June 2023
- Type
- Culvert
- Concrete
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 150
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
CR 511 over Draw is a concrete culvert carrying CR 511 over Draw in Medina County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, projected to reach 250 by 2038. The structure is 24 ft (7.3 m) long and 36 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 511 over Draw built?
It was built in 2019, making it 6 years old in 2025.
What condition is CR 511 over Draw in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does CR 511 over Draw carry?
About 150 vehicles per day (2018 count).
How long is CR 511 over Draw?
The structure is 24 ft (7.3 m) long with a longest span of 10 ft (3 m) and a deck 36 ft wide.
Who owns CR 511 over Draw?
It is owned by the County Highway Agency.