US 90 over Irrigation Canal
FairMedina County, Texas · 31.95 MI from Uvalde C/L · Structure no. 151630002406070
- Built
- 1940
- 85 years old, rebuilt 1983
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 62 ft
- 1 main span
- Daily traffic
- 22,100
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 90 over Irrigation Canal is a steel stringer/multi-beam or girder carrying US 90 over Irrigation Canal in Medina County, Texas. It was built in 1940 and reconstructed in 1983, so it is 85 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,100 vehicles a day, roughly 12% of them trucks, projected to reach 30,940 by 2042. The structure is 62 ft (18.9 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 90 over Irrigation Canal built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1983.
What condition is US 90 over Irrigation Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does US 90 over Irrigation Canal carry?
About 22,100 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is US 90 over Irrigation Canal?
The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 70 ft wide.
Who owns US 90 over Irrigation Canal?
It is owned by the State Highway Agency.