US Bridges

US 90 WB Exit Ramp over R.O.W. North of US 90

Good

Medina County, Texas · US 90 at SH 173 · Structure no. 151630002405043

Built
1994
31 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
525 ft
7 main spans
Daily traffic
16,881
2021 count
Owner
State
State Highway Agency

About this bridge

US 90 WB Exit Ramp over R.O.W. North of US 90 is a prestressed concrete stringer/multi-beam or girder carrying US 90 WB Exit Ramp over R.O.W. North of US 90 in Medina County, Texas. It was built in 1994, so it is 31 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,881 vehicles a day, roughly 7% of them trucks, projected to reach 25,060 by 2031. The structure is 525 ft (160 m) long and 28 ft wide.

CarriesUS 90 WB Exit Ramp
CrossesR.O.W. North of US 90
LocationUS 90 at SH 173
RouteU.S. Route 90
StateTexas
Coordinates29.34921, -99.11669
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length525 ft (160 m)
Longest span75 ft (22.9 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,881 (2021)
Projected traffic25,060 by 2031
Trucks7%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 90 WB Exit Ramp over R.O.W. North of US 90 built?

It was built in 1994, making it 31 years old in 2025.

What condition is US 90 WB Exit Ramp over R.O.W. North of US 90 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does US 90 WB Exit Ramp over R.O.W. North of US 90 carry?

About 16,881 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is US 90 WB Exit Ramp over R.O.W. North of US 90?

The structure is 525 ft (160 m) long with a longest span of 75 ft (22.9 m) and a deck 28 ft wide.

Who owns US 90 WB Exit Ramp over R.O.W. North of US 90?

It is owned by the State Highway Agency.