RM 2389 over Llano River Relief
FairPosted for loadMason County, Texas · 4.50 MI SW of RM 1723 · Structure no. 141570268801003
- Built
- 1930
- 95 years old, rebuilt 1962
- Condition
- Fair
- inspected June 2023
- Type
- Culvert
- Concrete
- Length
- 183 ft
- 16 main spans
- Daily traffic
- 317
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RM 2389 over Llano River Relief is a concrete culvert carrying RM 2389 over Llano River Relief in Mason County, Texas. It was built in 1930 and reconstructed in 1962, so it is 95 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 317 vehicles a day, roughly 3% of them trucks, projected to reach 300 by 2033. The structure is 183 ft (55.8 m) long and 25 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RM 2389 over Llano River Relief built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1962.
What condition is RM 2389 over Llano River Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does RM 2389 over Llano River Relief carry?
About 317 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is RM 2389 over Llano River Relief?
The structure is 183 ft (55.8 m) long with a longest span of 10 ft (3 m) and a deck 25 ft wide.
Who owns RM 2389 over Llano River Relief?
It is owned by the State Highway Agency.