US Bridges

Cooksey Lane over Bullhide Creek

Good

McLennan County, Texas · 1.45 MI NE of IH 35 · Structure no. 091610AA0829001

Built
2009
16 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
120 ft
3 main spans
Daily traffic
115
2022 count
Owner
County
County Highway Agency

About this bridge

Cooksey Lane over Bullhide Creek is a concrete stringer/multi-beam or girder carrying Cooksey Lane over Bullhide Creek in McLennan County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 115 vehicles a day, projected to reach 80 by 2036. The structure is 120 ft (36.6 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCooksey Lane
CrossesBullhide Creek
Location1.45 MI NE of IH 35
RouteCounty Highway 829
StateTexas
Coordinates31.40838, -97.18329
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic115 (2022)
Projected traffic80 by 2036
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cooksey Lane over Bullhide Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is Cooksey Lane over Bullhide Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Cooksey Lane over Bullhide Creek carry?

About 115 vehicles per day (2022 count).

How long is Cooksey Lane over Bullhide Creek?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 26 ft wide.

Who owns Cooksey Lane over Bullhide Creek?

It is owned by the County Highway Agency.