FM 933 over Aquilla Creek Relief
FairMcLennan County, Texas · 4.1 MI NW of FM 308 · Structure no. 091610020907047
- Built
- 1953
- 72 years old, rebuilt 1993
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 120 ft
- 4 main spans
- Daily traffic
- 3,879
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FM 933 over Aquilla Creek Relief is a concrete stringer/multi-beam or girder carrying FM 933 over Aquilla Creek Relief in McLennan County, Texas. It was built in 1953 and reconstructed in 1993, so it is 72 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,879 vehicles a day, roughly 8% of them trucks, projected to reach 6,410 by 2033. The structure is 120 ft (36.6 m) long and 47 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 933 over Aquilla Creek Relief built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1993.
What condition is FM 933 over Aquilla Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does FM 933 over Aquilla Creek Relief carry?
About 3,879 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is FM 933 over Aquilla Creek Relief?
The structure is 120 ft (36.6 m) long with a longest span of 30 ft (9.1 m) and a deck 47 ft wide.
Who owns FM 933 over Aquilla Creek Relief?
It is owned by the State Highway Agency.