US 84 EB over Tehuacana Creek Relief
FairMcLennan County, Texas · 1.2 MI SW of SH 31 · Structure no. 091610016201079
- Built
- 1979
- 46 years old, rebuilt 2002
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 303 ft
- 10 main spans
- Daily traffic
- 7,796
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 84 EB over Tehuacana Creek Relief is a concrete stringer/multi-beam or girder carrying US 84 EB over Tehuacana Creek Relief in McLennan County, Texas. It was built in 1979 and reconstructed in 2002, so it is 46 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,796 vehicles a day, roughly 12% of them trucks, projected to reach 9,715 by 2037. The structure is 303 ft (92.4 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 84 EB over Tehuacana Creek Relief built?
It was built in 1979, making it 46 years old in 2025. It was reconstructed in 2002.
What condition is US 84 EB over Tehuacana Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does US 84 EB over Tehuacana Creek Relief carry?
About 7,796 vehicles per day (2020 count), of which roughly 12% are trucks.
How long is US 84 EB over Tehuacana Creek Relief?
The structure is 303 ft (92.4 m) long with a longest span of 30 ft (9.1 m) and a deck 41 ft wide.
Who owns US 84 EB over Tehuacana Creek Relief?
It is owned by the State Highway Agency.