FM 765 over Salt Creek Relief
FairMcCulloch County, Texas · 1.05 MI E of Concho C/L · Structure no. 231600087005007
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 152 ft
- 5 main spans
- Daily traffic
- 334
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
FM 765 over Salt Creek Relief is a concrete stringer/multi-beam or girder carrying FM 765 over Salt Creek Relief in McCulloch County, Texas. It was built in 1958, so it is 67 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 334 vehicles a day, roughly 23% of them trucks, projected to reach 494 by 2038. The structure is 152 ft (46.3 m) long and 31 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 765 over Salt Creek Relief built?
It was built in 1958, making it 67 years old in 2025.
What condition is FM 765 over Salt Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does FM 765 over Salt Creek Relief carry?
About 334 vehicles per day (2022 count), of which roughly 23% are trucks.
How long is FM 765 over Salt Creek Relief?
The structure is 152 ft (46.3 m) long with a longest span of 30 ft (9.2 m) and a deck 31 ft wide.
Who owns FM 765 over Salt Creek Relief?
It is owned by the State Highway Agency.