US Bridges

SW Lp 289 EB over Spur 327 WB

Good

Lubbock County, Texas · 1.10 MI S of US 62 · Structure no. 051520078301098

Built
2006
19 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
236 ft
1 main span
Daily traffic
23,490
2010 count
Owner
State
State Highway Agency

About this bridge

SW Lp 289 EB over Spur 327 WB is a prestressed concrete stringer/multi-beam or girder carrying SW Lp 289 EB over Spur 327 WB in Lubbock County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23,490 vehicles a day, roughly 13% of them trucks, projected to reach 32,880 by 2030. The structure is 236 ft (71.9 m) long and 65 ft wide.

CarriesSW Lp 289 EB
CrossesSpur 327 WB
Location1.10 MI S of US 62
RouteState Highway 289
StateTexas
Coordinates33.53902, -101.93191
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length236 ft (71.9 m)
Longest span115 ft (35.1 m)
Deck width65 ft (19.8 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,490 (2010)
Projected traffic32,880 by 2030
Trucks13%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SW Lp 289 EB over Spur 327 WB built?

It was built in 2006, making it 19 years old in 2025.

What condition is SW Lp 289 EB over Spur 327 WB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SW Lp 289 EB over Spur 327 WB carry?

About 23,490 vehicles per day (2010 count), of which roughly 13% are trucks.

How long is SW Lp 289 EB over Spur 327 WB?

The structure is 236 ft (71.9 m) long with a longest span of 115 ft (35.1 m) and a deck 65 ft wide.

Who owns SW Lp 289 EB over Spur 327 WB?

It is owned by the State Highway Agency.