IH 27 NB FR over Yh Draw/Cesar Chavez DR
GoodLubbock County, Texas · 0.37 MI N of US 82 · Structure no. 051520006711194
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 310 ft
- 2 main spans
- Daily traffic
- 5,980
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH 27 NB FR over Yh Draw/Cesar Chavez DR is a prestressed concrete stringer/multi-beam or girder carrying IH 27 NB FR over Yh Draw/Cesar Chavez DR in Lubbock County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,980 vehicles a day, roughly 12% of them trucks, projected to reach 8,380 by 2033. The structure is 310 ft (94.5 m) long and 48 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 27 NB FR over Yh Draw/Cesar Chavez DR built?
It was built in 1990, making it 35 years old in 2025.
What condition is IH 27 NB FR over Yh Draw/Cesar Chavez DR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does IH 27 NB FR over Yh Draw/Cesar Chavez DR carry?
About 5,980 vehicles per day (2013 count), of which roughly 12% are trucks.
How long is IH 27 NB FR over Yh Draw/Cesar Chavez DR?
The structure is 310 ft (94.5 m) long with a longest span of 115 ft (35.1 m) and a deck 48 ft wide.
Who owns IH 27 NB FR over Yh Draw/Cesar Chavez DR?
It is owned by the State Highway Agency.