CR 208 over Daniel Branch
PoorPosted for loadLimestone County, Texas · 3.3 MI SE of Navarro C/L · Structure no. 091470AA0181003
- Built
- 1994
- 31 years old
- Condition
- Poor
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 60 ft
- 2 main spans
- Daily traffic
- 100
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
CR 208 over Daniel Branch is a steel stringer/multi-beam or girder carrying CR 208 over Daniel Branch in Limestone County, Texas. It was built in 1994, so it is 31 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, projected to reach 70 by 2029. The structure is 60 ft (18.3 m) long and 16 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 208 over Daniel Branch built?
It was built in 1994, making it 31 years old in 2025.
What condition is CR 208 over Daniel Branch in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2024.
How much traffic does CR 208 over Daniel Branch carry?
About 100 vehicles per day (2015 count).
How long is CR 208 over Daniel Branch?
The structure is 60 ft (18.3 m) long with a longest span of 29 ft (8.8 m) and a deck 16 ft wide.
Who owns CR 208 over Daniel Branch?
It is owned by the County Highway Agency.