FM 937 over Sand Branch Tributary
GoodLimestone County, Texas · 5.20 MI S of SH 164 · Structure no. 091470119104016
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected December 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 155 ft
- 1 main span
- Daily traffic
- 1,358
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FM 937 over Sand Branch Tributary is a prestressed concrete stringer/multi-beam or girder carrying FM 937 over Sand Branch Tributary in Limestone County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,358 vehicles a day, roughly 17% of them trucks, projected to reach 1,570 by 2038. The structure is 155 ft (47.2 m) long and 46 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 937 over Sand Branch Tributary built?
It was built in 2008, making it 17 years old in 2025.
What condition is FM 937 over Sand Branch Tributary in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.
How much traffic does FM 937 over Sand Branch Tributary carry?
About 1,358 vehicles per day (2020 count), of which roughly 17% are trucks.
How long is FM 937 over Sand Branch Tributary?
The structure is 155 ft (47.2 m) long with a longest span of 75 ft (22.9 m) and a deck 46 ft wide.
Who owns FM 937 over Sand Branch Tributary?
It is owned by the State Highway Agency.